Services

Alpinists NTD Services

Rope Access Technician NTD Services

With our Rope Access Technicians, we can complete Visual Inspection, Bolt Torque Checking, and Ultrasonic with Magnetic-Penetrant liquids in Steel Structures, as well as Bolt tightening with Manual & Electrical Torque Wrenches (up to 2000Nm). We can approach any height, avoiding the high costs of conventional ways of access and equipment to perform any assigned task.

COMPLETED PROJECTS IN CEMENT FACTORIES REGARDING INSPECTIONS & HIGH ALTITUDE WORKS

1. PROJECT in TITAN Company: Reconstruction of the Insulation of the Stack in the Factory at Thessalonica (110m height).
2. PROJECT in TITAN Company: Inspection and installation of Polycarbonate cladding in the preheater in the Factory at Thessalonica (115m height)
3. PROJECT in TITAN Company: Replacement of the side cladding of 2 Dubrava Silos & Removal of the hardened Cement, in the Factory at Thessalonica.
4. PROJECT in TITAN Company: Inspection of the inner area of 39 Silos in the Factory at Thessalonica.
5. PROJECT in TITAN Company: Removal of the mounted Cement in Silo No 6 (30m height) in the Factory at Thessalonica
6. PROJECT in TITAN Company: Inspection of Clinker Silos F12,5 at Kamaris Factory
7. PROJECT in TITAN Company: Inspection of Northern Silo at Kamaris Factory (65m height)
8. PROJECT in TITAN Company: Repair Works of the Roof in Northern Silo at Kamaris Factory of (65m height)
9. PROJECT in TITAN Company: Inspection of 14 Silos in the Factory at Elefsinas Factory.
10. PROJECT in TITAN Company: Inspection of the Coal & Exhaust Gas Ducts Steel Frame with NTD method at Patras Factory.
11. PROJECT in TITAN Company: Inspection of 46 Silos with NTD, Gas Free & ATEX directives and methods at Patras Factory.
12. PROJECT in TITAN Company: Inspection of 31 Silos with NTD methods at Elefsinas Factory.
13. PROJECT in TITAN Company Material removal with conveyor belts from Cement Silos
14. PROJECT in TITAN Company Cleaning & Painting Works in Cement Factory Silo with epoxy coatings
15. PROJECT in TITAN Company Material removal from the structure of the silo and the roof.
16. PROJECT in BARILLA Company – 8 ConcreteSilo Inspection.
17. PROJECT in BARILLA Company – 4 ConcreteSilo Repair works with Penetron Materials.
18. PROJECT in INTERBETON Company: Inspection of 6 Cement Silo.
19. PROJECT in KOSOVO TITAN (SHARCCEM) – Inspection of Preheater Ducts & Raw Mill Ducts (from Inside).
20. PROJECT in TITAN Company – Inspection of Preheater Chimney (from Inside).
21. PROJECT in ALBANIA TITAN (ANTEA) – Inspection of No 3 & No 5 Silo.
22. PROJECT in TITAN Company: Inspection of 6 Silos at Kamaris Factory.